Skip to main content
Bashaer Al Khair — Water Leak Detection & Waterproofing
Active Service Coverage:Jeddah & Makkahالعربية
Bashaer Al Khair Waterproofing & Water Leak Detection
Bashaer Al KhairWaterproofing & Leak Detection
Thermal Envelope Efficiency (SBC 601 / 602)Makkah

Thermal Roof Insulation in Makkah: Strong Protection for Your Building Against Extreme Heat

In Makkah, we deal with the intense heat of the basin using continuous thermal insulation (XPS/PIR inverted roofs and closed-cell SPF). It limits heat soaking into the concrete and reduces thermal stress on the structure.

Clear focus on thermal conductivity, R-value and U-value
In line with the Saudi Building Code on energy saving (SBC 602 / 601)
Thermal insulation and waterproofing layers that work as one
Installation of rigid thermal insulation boards and geotextile separation felt on a building roof in Makkah and Jeddah
Building Envelope Thermal Resistance & Heat-Transfer MitigationIllustrative
Application Scope: Villa and Residential Roofs, Multi-Story Apartment Buildings, Commercial Roofs and Metal Decks
Engineering Problem Analysis in Makkah

How Uninsulated Roofs Affect Indoor Comfort and Building Life

Flat roofs in Jeddah and Makkah take the strongest direct sun all day. Bare reinforced concrete conducts heat well and holds a lot of it. It soaks up heat all afternoon and radiates it down into upper-floor rooms all night.

A hot roof makes upper rooms uncomfortable and overworks the AC. It also swings sharply between day and night temperatures. This causes expansion stress that speeds up cracks in concrete, screed and edge joints.

01

Upper-Floor Rooms Staying Hot at Night Despite Constant AC

Technical Mechanism: Low roof thermal resistance (R-value) lets heat pass quickly from the sun-heated slab into living spaces.

Risk If Ignored:Peak AC compressor load all the time, with no steady indoor comfort.
02

Thermal Bridging Across Beams, Columns & Parapet Junctions

Technical Mechanism: Gaps between insulation boards, or bare structural parts, let heat bypass the insulation layer.

Risk If Ignored:A big drop in the overall U-value of the assembly, and a risk of local condensation.
03

Early Aging of Waterproofing Membranes Under Extreme Heat Cycling

Technical Mechanism: When waterproofing sits exposed to extreme temperature swings with no thermal protection over it, thermal fatigue ages the membrane faster.

Risk If Ignored:Waterproofing layers turn brittle, joints split, and rainwater leaks in.
Roof Heat Transfer Physics (SBC 601 / 602)

Uninsulated vs. Thermally Insulated Roof in Makkah

Reducing Thermal Transmittance (U-Value)
Without Thermal InsulationHigh Conductive Heat Gain

Bare Concrete Absorbs, Stores & Radiates Heat Indoors

  • • Sunlight heats the concrete slab, which conducts heat straight into top-floor rooms.
  • • The thermal mass keeps releasing stored heat downward well into the night.
  • • Constant AC compressor strain and heavy heat expansion stress on the slab.
With Engineered Thermal BarrierHigh Thermal Resistance (R-Value)

Continuous Insulation Blocks Heat Flow and Protects the Slab

  • • Low-conductivity insulation (XPS / PIR / Closed-Cell SPF) stops solar heat before it reaches the structural slab.
  • • The structural concrete slab stays thermally stable near indoor air-conditioned temperatures.
  • • Follows Saudi Building Code (SBC 601 / 602) principles for an efficient building shell and keeps indoor comfort steady.

Illustrative diagram only. The actual layer order and spec are set after an on-site surface inspection, per manufacturer TDS.

Technical Service Definition & Scope Boundaries

Thermal Roof Insulation vs. Waterproofing and Reflective Coatings

Thermal roof insulation means installing materials with low thermal conductivity ($lambda$) at set thicknesses and densities. This slows heat flow through the roof. It follows building envelope principles in the Saudi Building Code (SBC 602 for low-rise residential and SBC 601 for non-residential buildings).

It helps to tell three things apart. (1) Waterproofing blocks liquid water. (2) Bulk Thermal Insulation (such as XPS or PIR boards or closed-cell SPF) gives true thermal resistance ($R$-value). (3) Solar Reflective Coatings reflect surface radiation when clean, but are too thin to give bulk thermal resistance on their own.

What Bashaer Al Khair's Work Includes:

  • Checking the existing roof build (inverted roof, conventional roof or exposed deck) and the waterproofing barrier below.
  • Supply and install the right thermal insulation system (XPS boards, EPS boards, PIR/PUR panels, or closed-cell SPF).
  • Installing the required separation and protection layers. These are non-woven geotextile filter fabric, screed or ballast preparation, or UV-protective topcoats.

Engineering Scope Boundaries & Transparency

  • Rigid thermal insulation boards (XPS/EPS/PIR) are NOT a waterproofing system. Water flows freely between board joints. So a sound waterproofing membrane beneath them is a must.
  • We never make unscientific promises such as "guaranteed 50% electricity bill reduction" or "20°C temperature drop in all buildings". Real energy performance depends on the whole building envelope (walls, glazing, shading and HVAC).
Approved Material Systems:

Extruded Polystyrene (XPS), Expanded Polystyrene (EPS), PIR/PUR Boards, Closed-Cell SPF and Composite Roof Systems

Roof Assemblies & Applications for Thermal Insulation

Thermal insulation fits into several roof designs, depending on the building stage and how the deck is used:

Inverted Roof Assemblies for Villas & Apartment Buildings

Substrate Type: Concrete slab + slope screed + tested waterproofing membrane.

Suitability Condition:Water-resistant closed-cell XPS boards go over the waterproofing membrane to shield it from heat stress. They are topped with geotextile filter fabric and tiles or gravel ballast.

Exposed Non-Tiled Concrete Roofs (Thermal & Moisture Retrofit)

Substrate Type: Existing exposed concrete deck with rooftop HVAC and piping.

Suitability Condition:Suited to seamless closed-cell spray polyurethane foam (SPF) with a UV-resistant elastomeric topcoat to remove thermal bridges.

Corrugated Metal Roofs, Warehouses & Rooftop Annexes

Substrate Type: Profiled metal sheets or lightweight roofs with very high thermal conductivity.

Suitability Condition:Insulated with UV-protected spray polyurethane foam or rigid PIR or mineral wool boards within composite roof assemblies.
Pre-Application Substrate Diagnostics

Pre-Installation Surface & Envelope Evaluation

Before installing thermal boards or spray systems, our engineers check four key points to make sure the layers work together:

1. Verifying Underlying Waterproofing Integrity

Laying thermal boards and tiles over an unwaterproofed or leaking slab traps rainwater under the insulation. This makes future leak repairs costly.

Impact on System Selection:Thermal boards go in only after the main waterproofing membrane has been inspected and approved.

2. Substrate Flatness for Rigid Insulation Boards

Laying rigid XPS or PIR panels over uneven concrete makes boards rock and crack under foot traffic. It also leaves open thermal gaps.

Impact on System Selection:On uneven or pipe-crowded decks, seamless spray foam may be advised over rigid board stock.

3. Checking Door Thresholds, Parapet Heights & Drain Levels

Adding rigid thermal insulation boards, screed, and tiles raises the finished roof floor level.

Impact on System Selection:Makes sure the total thickness fits roof door thresholds, drain extensions and parapet upstand heights.
Service-Specific Material & Assembly Comparison

Comparison of Thermal Roof Insulation Materials

Thermal insulation performance depends on the material's thermal conductivity ($lambda$), installed thickness, resistance to moisture absorption, and compressive strength:

Closed-Cell Rigid Foam Boards With High Compressive Strength and Low Water Absorption

Extruded Polystyrene Rigid Boards (XPS)

Best Suited For: Inverted roof assemblies, installed above the waterproofing membrane and under geotextile felt and tiles or ballast.

Limitations & Engineering Precautions:Sensitive to direct UV, petroleum solvents and open flame. It needs tight shiplap or butt joints and immediate ballast or tile cover.
High-Efficiency Thermal Boards with Very Low Thermal Conductivity

Rigid Polyisocyanurate / Polyurethane Boards (PIR / PUR)

Best Suited For: Standard warm-roof builds and metal decks that need high R-value in tight vertical space.

Limitations & Engineering Precautions:Keep it sealed in a dry spot, under the waterproofing membrane and above a vapor barrier. It handles wet, inverted exposure less well than XPS.
Lightweight Molded Bead Polystyrene Insulation

Expanded Polystyrene Boards (EPS)

Best Suited For: Thermal uses that are protected from standing water and heavy point loads.

Limitations & Engineering Precautions:Absorbs more water and has lower compressive strength than XPS. Not recommended for wet inverted roofs.
In-Situ Seamless Thermal & Moisture Barrier

Closed-Cell Spray Polyurethane Foam (SPF)

Best Suited For: Exposed concrete and metal roofs with many penetrations, where avoiding heat bridges matters most.

Limitations & Engineering Precautions:Density and thickness must follow product specifications. A UV-resistant elastomeric topcoat is required.
Step-by-Step Application & Quality Control

Application Overview for Roof Thermal Insulation Systems

Note: This is the general installation order. Board thickness and layer order follow the building design and SBC requirements.

Phase 1: Inspecting & Verifying the Waterproofing Substrate

Confirming that the waterproofing membrane below is intact, tested and free of sharp debris before laying thermal boards.

Quality Checkpoint: Zero leaks or surface projections that could puncture the membrane or crack rigid boards.

Phase 2: Staggered, Tight-Joint Installation of Thermal Boards

Laying thermal insulation boards in a staggered pattern with interlocking shiplap edges to prevent thermal bridging.

Quality Checkpoint: Boards laid flat, tight edge joints, and precise cuts around bases and roof drains.

Phase 3: Installing the Non-Woven Geotextile Separation Layer

Cover the thermal boards with overlapped non-woven geotextile felt. This stops mortar fines or sand washing into board joints.

Quality Checkpoint: Full board coverage with proper overlap seams and edge upturns.

Phase 4: Apply the Final Protective Ballast, Screed or Tiling

Shielding the thermal insulation from solar UV damage, wind uplift and floating during heavy rain.

Quality Checkpoint: Keeping expansion joints in the top tile or screed layer, and checking that water drains freely into scuppers.

Critical Detailing to Prevent Thermal Insulation Failure

Thermal insulation works well only if the material conducts little heat and four key installation details are done right:

1. Eliminating Thermal Bridges at Board Joints & Perimeters

Failure Risk:Leaving 1–2 cm gaps between boards or around plinths creates channels for heat. This lowers the overall roof R-value.

Our Engineering Treatment:Using shiplap-edge boards and sealing unavoidable narrow edge gaps with compatible closed-cell polyurethane foam.

2. Protecting XPS/EPS Boards from Direct Sun and Wind Lift

Failure Risk:Leaving polystyrene boards in direct sunlight causes surface chalking, warping and wind uplift damage.

Our Engineering Treatment:Cover installed boards quickly with geotextile filter fabric and the specified ballast, screed or paving system.

3. Preserving Dual-Level Drainage Flow

Failure Risk:In inverted roofs, water seeps down to the waterproofing membrane under the XPS boards. Blocked lower drain ports trap the water.

Our Engineering Treatment:Using dual-level roof drains that collect runoff both at the finished tile surface and at the membrane level below the boards.

Limits and Realistic Expectations for Thermal Roof Insulation

We explain the limits of roof thermal insulation so owners can make informed decisions:

Roof insulation only cuts heat gain through the roof slab. Solar heat through unshaded single-pane windows or uninsulated outer walls must be handled separately.
Thermal boards do not stop water leaks. If a roof lets rain through, the waterproofing membrane must be installed or repaired first.
No single thickness (such as 3 cm or 5 cm) applies to all materials and buildings. Under SBC 601/602, the required thickness depends on the material's thermal conductivity and the total roof assembly design.
How to Choose: Waterproofing, Plumbing Repair or Leak Detection

Distinguishing Thermal Insulation, Waterproofing & Roof Restoration

Use this matrix to see which service fits your roof condition in Jeddah or Makkah:

Ceiling & Roof Water Ingress Diagnostic Inspection
High heat transfer through the roof slab

Severe summer heat in upper-floor rooms with no water leaks

Correct Engineering Action: Install Thermal Roof Insulation (covered XPS boards or UV-protected closed-cell SPF).

When Waterproofing Applies: Verify existing waterproofing before laying thermal boards.
Need for both thermal resistance and rainwater waterproofing

High summer heat + winter rainwater leaks on a non-tiled roof

Correct Engineering Action: Install a dual system. Use closed-cell SPF with a UV topcoat, or an inverted roof system (waterproofing membrane plus XPS boards).

When Waterproofing Applies: Waterproofing and thermal insulation are done together as one system.
Undiagnosed water ingress source

Damp or dripping ceiling with unknown source (rain or roof pipes)

Correct Engineering Action: Do Ceiling and Roof Leak Detection before covering the deck with thermal insulation.

When Waterproofing Applies: Applied after the leak source is fixed and the slab is dry.
Local Climate, Soil & Architectural Context in Makkah

Why Thermal Insulation in Makkah Needs Local Expertise

Property in Jeddah? View Jeddah Page

Makkah has extreme summer temperatures. Solar radiation reflected off the surrounding rocky mountains makes them worse. The roof slab is the main source of heat gain in villas, apartments and hotels.

Makkah has intense heat radiation, made stronger by the rocky mountain basins around it. Seasonal torrential rain also loads flat roofs fast and sends runoff along rock fissures toward foundations and underground cisterns. Multi-story homes and hotels in Makkah also have dense rooftop equipment, which creates critical penetration zones.

Key Building Envelope Challenges We Solve in Makkah:

  • Thick concrete roof slabs in Makkah buildings store a lot of solar heat by day. At night they release it into the rooms unless they are insulated on the outside.
  • Crowded rooftops in Al-Aziziyah, Al-Shawqiyah and Al-Awali need careful detailing around equipment plinths to avoid thermal bridging.

Common Local Application Scenarios in Makkah:

Thermal Roof Insulation for Villas and Buildings in Al-Awali, Al-Shara'i and Batha Quraish

Installing XPS board assemblies or closed-cell spray foam to cut heat moving through the roof and to shield waterproofing membranes.

Commercial and Hospitality Roof Insulation in Al-Aziziyah, Al-Naseem and Al-Zaydi

Applying high-strength thermal insulation that can take maintenance loads. It is made for SBC 601 commercial building shell standards.

Serving all Makkah districts: Al-Awali, Al-Shara’i, Batha Quraish, Al-Shawqiyah, Al-Zaydi, Al-Kakiyah, Al-Aziziyah, Al-Naseem, Al-Nuzha and Al-Umrah.All Waterproofing Services in Makkah

Cost Drivers for Roof Thermal Insulation Projects

Thermal roof insulation pricing depends on the specification and site conditions:

1. Thermal Insulation Material (XPS / PIR / EPS / SPF)

High-density extruded polystyrene (XPS) and polyisocyanurate (PIR) boards cost differently from standard EPS or spray foam.

Inspection Requirement: Choosing the material type based on roof traffic and design needs.

2. Specified Thickness & Material Density

A thicker board or deeper foam gives a higher R-value. It also uses more material per square meter.

Inspection Requirement: Checking the allowed thickness against door thresholds and drain heights.

3. Need for Waterproofing Below or Protection Layers Above

Whether the project includes just thermal boards and geotextile, or a full waterproofing, thermal and top-protection package.

Inspection Requirement: Inspecting existing roof layers.

Pre-Assessment Checklist for Thermal Roof Insulation

  • Have architectural drawings or energy calculations ready if the new building is under SBC review.
  • Say whether the finished roof will stay unwalked, covered with gravel, or tiled for daily use.
  • Give roof access so our engineer can inspect the existing waterproofing, thresholds and drainage outlets.

Quality Assurance & Verification for Thermal Insulation

We check thermal insulation quality with set checkpoints on site:

Board Joint Tightness & Thermal Bridge Inspection

Before laying geotextile felt, we inspect all board joints to ensure tight shiplap contact and no uninsulated gaps.

Material Label & Thickness Verification

Checking that delivered insulation boards match the agreed thickness, density and manufacturer data sheet.

Technical Standards & 6-Step Field Evaluation Protocol
SBC 602

Saudi Building Code: Energy Conservation for Low-Rise Residential Buildings (SBC 602)

Sets the maximum heat transfer (U-value) for roofs and outer walls in low-rise villas, by climate zone. Jeddah and Makkah are hot zones that need strong roof heat resistance.

SBC 601

Saudi Building Code: Energy Conservation for Non-Residential Buildings (SBC 601)

Sets the thermal performance of building envelopes for commercial, office, hotel and multi-story buildings. It stresses continuous insulation and fewer thermal bridges.

SBC 303

Saudi Building Code: Soils and Foundations, Damp-Proofing and Waterproofing (SBC 303)

Separates damp-proofing (no water pressure) from full waterproofing. Full waterproofing is needed where groundwater, water pressure, or sulfate and chloride soils are present, as in coastal Jeddah.

TDS / SDS & Potable Water Standards

Manufacturer Technical Data Sheets (TDS), Safety Data Sheets (SDS) and Potable Contact Certifications

Manufacturer TDS documents set the maximum base moisture, primer pairing, use rate per m², recoat intervals and full curing times before water immersion.

01. Confirming There Are No Active Plumbing Leaks Before Waterproofing

Before we propose waterproofing for roofs, bathrooms, tanks or pools, we check whether the moisture comes from pressurized pipes, drains or float valves. If it does, we start with leak detection.

02. Inspecting Substrate Condition & Existing Layers

We check the substrate type (concrete, tile, metal), screed condition, cracks, honeycombing and hollow tiles. We also check whether existing insulation can be restored or must be removed.

03. Measuring Trapped Moisture & Checking Drainage Slopes

We map ponding zones, slope toward rainwater scuppers and drains, and moisture levels under tiles or inside the concrete. This prevents blistering after application.

04. Matching Waterproofing / Thermal System to Usage & Exposure

We determine whether the asset requires waterproofing, thermal insulation, or a combined system, selecting materials matched to foot traffic, UV exposure, or continuous water immersion.

05. Detailing Critical Zones (Upstands, Expansion Joints & Penetrations)

We specify details for parapet wall coving and upstands, structural expansion joints, HVAC and tank plinths, floor drains and pipe sleeves.

06. Defining Work Scope & Transparent Quotation Breakdown

We give a clear scope covering surface preparation, the proposed system layers, and topcoat or protection needs. This way the client understands exactly what the quote covers.

Engineering Scope & Quotation Request Engine

Build Your Project Scope & Request an Itemized Quote in Makkah

We never quote vague flat rates without checking your surface. Choose your project details below to get a technical scope summary and book an engineer visit.

Itemized Engineering Quote ScopeMakkah
Target System: Extruded Polystyrene (XPS) Inverted Roof Boards & Polyurethane Thermal Systems (SBC 601/602)
Surface Prep Line Item: Mechanical grinding, crack/honeycomb repair, 45° coving, and compatible primer coat.
Critical Details & Protection: Sealing drains, expansion joints, and pipe penetrations, and checking the topcoat and protection.
Ready-to-Send Scope Summary:
Hello Bashaer Al Khair, I would like to request an inspection and quotation for waterproofing/insulation:
- Service: Roof Thermal Insulation Makkah
- City: Makkah
- Property Type: Residential Villa
- Approx. Area: 100 to 250 m² (Standard Villa Roof/Tank)
- Substrate State: New Concrete / Screed Ready for Insulation
Interactive Smart Insulation & Waterproofing Finder

Choose Your Property Details for an Instant Expert Tip

Recommended Waterproofing / Insulation Service in Makkah:

Complete Roof Waterproofing (Concrete & Tiled Roofs)

Proposed Engineering Assembly: Reinforced Liquid Polyurethane Membranes or Bitumen Systems Matched to the Deck

Gives full roof rainwater protection. We detail the slope, parapet coving and drain collars.

Interactive Waterproofing & Insulation System Guide

Material and System Comparison: Where Each System Works Best and Its Limits

Filter by building zone to compare each system on water exposure, sun UV resistance, foot traffic, protective layers, and surface limits:

Sheet Membrane Waterproofing

Modified Bituminous Membranes (APP / SBS Rolls)

Primary Use Cases & Compatible Substrates:

Concrete roofs before tiling, buried foundations, retaining walls, and exposed roofs with no traffic (with mineral slate-surfaced APP rolls).

Substrates: Smooth reinforced concrete slabs and cured slope screed. Prime them with a matching bitumen primer.

Water Exposure Rating:

Strong against rainwater ponding and damp in the ground. The side (10 cm) and end (15 cm) laps must be fully fused.

Solar & UV Resistance:

Smooth rolls need UV cover. Mineral-slate-surfaced APP membranes resist direct sun on roofs with no traffic.

Foot Traffic Suitability:

Low when exposed. It needs a geotextile separation felt and a protective screed or tiling for regular foot traffic.

Protective Layer Needed:

Yes, on roofs with traffic and buried foundations. Use protection boards or non-woven geotextile felt under the screed or backfill.

Technical Limitations & Precautions:

Not suitable for drinking water tanks inside buildings or swimming pools. Seam quality depends on skilled lap work.

Grinding sharp concrete projections, forming 45° cementitious cant strips at wall junctions, and applying bituminous primer.View Service Page
Two-Component Slurry Waterproofing

Polymer-Modified Flexible Cementitious Waterproofing

Primary Use Cases & Compatible Substrates:

Bathrooms and wet zones before tiling, concrete water tanks, swimming pool shells under mosaic tiles, and foundations.

Substrates: Sound reinforced concrete, cement renders, and plastered masonry. The surface must be saturated-surface-dry (SSD).

Water Exposure Rating:

Made for constant water contact (tanks and pools). It handles positive and some negative water pressure.

Solar & UV Resistance:

Moderate to low under long direct desert sun. Cover it with ceramic or mosaic tiles or protective coatings.

Foot Traffic Suitability:

Handles light foot traffic during work once cured. Permanent foot traffic needs protective tiling or screed.

Protective Layer Needed:

Yes, on floors and decks. Use ceramic or porcelain tiles with a matching C2TE/S1 flexible adhesive, or a protective screed.

Technical Limitations & Precautions:

Bridges cracks less than pure polyurethane membranes. Not meant as an exposed roof coating over wide thermal joints.

Remove laitance and form oils. Repair honeycombing with non-shrink mortar. Pre-wet the surface with no standing water.View Service Page
Seamless Liquid-Applied Waterproofing

Liquid-Applied Acrylic & Hybrid Elastomeric Membranes

Primary Use Cases & Compatible Substrates:

Sloped exposed roofs without heavy ponding, UV topcoat over spray polyurethane foam, and parapet and roof repair.

Substrates: Concrete, cement screed, closed-cell spray polyurethane foam (SPF), and tiled surfaces that are properly abraded and primed.

Water Exposure Rating:

Works well against running rainwater. Pure acrylics are not advised for permanent ponding unless they are PU-hybrid.

Solar & UV Resistance:

Excellent. It resists UV damage and keeps its stretch and its white or light, sun-reflecting finish.

Foot Traffic Suitability:

Suits light maintenance foot traffic. Regular traffic needs full fleece reinforcement or a pedestrian-grade PU topcoat.

Protective Layer Needed:

No UV cover needed. The membrane is made for direct sun.

Technical Limitations & Precautions:

Not suitable for tanks or pools full of water. It cannot fix severe negative roof slopes that hold deep water.

Clean well, dry the surface, seal hairline cracks, and apply a primer matched to the surface pores.View Service Page
High-Elongation Seamless Polyurethane Membrane

High-Elastomeric Liquid Polyurethane Waterproofing Systems

Primary Use Cases & Compatible Substrates:

Concrete and tiled roofs with ponding water, balconies, terraces, and rooftop equipment areas.

Substrates: Dry concrete (<4–5% moisture content), and existing ceramic/porcelain tiles after mechanical grinding and specialized epoxy/PU primer.

Water Exposure Rating:

Very good against standing and ponding rainwater. It bridges cracks well through heat cycles.

Solar & UV Resistance:

Aromatic base coats need an aliphatic polyurethane UV-stable topcoat when left in direct sun.

Foot Traffic Suitability:

Good to high durability with a pedestrian-grade aliphatic polyurethane wear coat.

Protective Layer Needed:

Needs an aliphatic UV topcoat if exposed. If tiled over, use silica sand or a geotextile layer.

Technical Limitations & Precautions:

It can peel or blister over old tiles whose sand bed is full of trapped water.

Moisture testing, surface profiling, polyurethane joint sealant detailing, and a matching primer coat.View Service Page
Building Envelope Thermal Insulation (SBC 601 / 602 Context)

Rigid Thermal Insulation Boards (XPS / EPS / PIR)

Primary Use Cases & Compatible Substrates:

Villa, home, and commercial flat roofs (inverted or standard roof builds) to cut heat transfer.

Substrates: Fitted over tested waterproofing membranes (in inverted roofs with geotextile filter fabric) under ballast or tiles.

Water Exposure Rating:

Extruded polystyrene (XPS) boards absorb little water. But board joints are NOT waterproof, so a separate waterproofing membrane is a must.

Solar & UV Resistance:

It breaks down under direct UV and wind lift. Always cover it with geotextile fabric and gravel ballast, tiles, or screed.

Foot Traffic Suitability:

Takes foot traffic once covered by a load-spreading screed or paving slabs matched to the board strength.

Protective Layer Needed:

Required: a non-woven geotextile filter layer plus heavy ballast, paving tiles, or screed. This stops UV damage and wind lift.

Technical Limitations & Precautions:

It never stops water leaks by itself. It only adds heat resistance to a multi-layer roof system.

First flood-test and check the waterproofing membrane below. Make sure the bed is flat and free of debris.View Service Page
Seamless Heat and Moisture Barrier System (Needs UV Topcoat)

Closed-Cell Spray Polyurethane Foam (SPF System)

Primary Use Cases & Compatible Substrates:

Exposed concrete roofs, corrugated metal and warehouse roofs, and roofs with many HVAC or pipe penetrations that need seamless cover.

Substrates: Dry, clean concrete decks, primed and rust-free metal decks, and solid surfaces free of moisture, oil, and loose dust.

Water Exposure Rating:

Closed-cell SPF with a continuous elastomeric or acrylic topcoat resists rainwater well when the roof drains properly.

Solar & UV Resistance:

Raw polyurethane foam oxidizes and chalks fast under UV rays. A UV-resistant elastomeric topcoat is a must.

Foot Traffic Suitability:

Moderate. It handles careful maintenance traffic. Sharp tools or dragged heavy equipment can puncture the topcoat.

Protective Layer Needed:

Required: a UV-protective elastomeric acrylic or polyurethane coating, or geotextile separation felt under screed or tiles.

Technical Limitations & Precautions:

Open-cell foam is not suitable for outdoor roofs. Any gap in the UV topcoat exposes the foam to sun damage.

Pressure wash and dry fully. Remove loose mortar. Mask nearby AC units, solar panels, and parapets.View Service Page
Continuous-Immersion Waterproofing & Concrete Lining

Special Water Tank and Pool Coatings (Epoxy and Hydraulic Mortars)

Primary Use Cases & Compatible Substrates:

Inside lining of reinforced concrete water tanks (using certified drinking-water systems) and swimming pool shells.

Substrates: Reinforced concrete that is mechanically profiled. Seal all honeycombing, tie-rod holes, and active negative leaks first.

Water Exposure Rating:

Made for 24/7 constant water contact. It resists chlorides and water treatment chemicals.

Solar & UV Resistance:

Tank epoxies suit enclosed tanks (low UV stability). Outdoor pools use flexible cement membranes under tiles.

Foot Traffic Suitability:

High abrasion resistance during regular tank cleaning once the full curing time from the maker is done.

Protective Layer Needed:

Drinking-water tank epoxy is the final smooth lining. Pool cement waterproofing is covered by mosaic tiles and chemical-resistant grout.

Technical Limitations & Precautions:

Never assume general industrial epoxy is safe for drinking water. Ask for proof of drinking-water compliance and allow full cure time.

Ventilate the tank. Grind off concrete laitance. Rout and plug cracks with hydraulic mortar. Form corner fillets. Dry the surface.View Service Page

Important Engineering Note: This guide compares material families. The final system, primer pairing, and layer build-up are set after an on-site surface and moisture check per the maker TDS.

FAQs — Thermal Insulation Makkah

Technical Answers on Thermal Insulation Makkah

Do white solar-reflective roof paints replace thermal insulation boards or spray foam?

No. Reflective coatings lower surface temperature by reflecting sunlight when clean. But they are under a millimeter thick, so they add almost no thermal resistance (R-value) compared with bulk XPS/PIR boards or spray foam. On their own they cannot meet Saudi Building Code U-value targets.

What thickness of thermal insulation does the Saudi Building Code (SBC 602 / 601) require?

The Saudi Building Code does not set one fixed thickness for all materials. Instead, it sets maximum roof heat transfer (U-value) targets by climate zone and building class. The required thickness comes from the material's thermal conductivity (λ) and all the roof assembly layers.

Do blue XPS thermal insulation boards stop rainwater leaks on their own?

No. Extruded polystyrene (XPS) itself resists water absorption, but rainwater flows freely through the joints between boards. A continuous, tested waterproofing membrane under the thermal boards is always required.

What is the purpose of the geotextile felt layer placed over thermal insulation boards?

Non-woven geotextile felt acts as a separation and filter layer. It stops sand, mortar fines and dirt from washing into the joints between thermal boards. This keeps the insulation continuous and stops boards from shifting.

Can thermal insulation be added to an existing occupied building in Jeddah or Makkah?

Yes. On exposed non-tiled roofs, we can apply closed-cell spray polyurethane foam with a UV-resistant elastomeric topcoat cleanly. It adds no heavy load and needs no demolition. For tiled roofs, our engineer checks threshold heights and moisture conditions to recommend the right retrofit.

Engineering Guides, Symptom Diagnosis & Material Comparisons

Comparison Guides to Help You Decide

Browse All 12 Engineering Guides
Roof Waterproofing Engineering Guide12 min

Guide to Tiled, Bare Concrete and Shinko Roof Waterproofing: Choosing the Right System Before and After Tiling

A new bare-concrete roof slab needs a different waterproofing plan from other roofs. An occupied villa’s tiled roof needs another, and so does a corrugated galvanized steel (Shinko) annex.

Read Engineering Guide & Comparison
Service Selection Decision Guide11 min

Water Leak Detection, Plumbing Repair, Waterproofing or Thermal Insulation: Which Do You Need First?

Owners often mix up waterproofing and pipe repair. Coating over a burst pressurized pipe will never stop the leak. Fixing a pipe fitting will not stop shower seepage if the wet-area membrane has failed.

Read Engineering Guide & Comparison
Moisture Symptom Diagnostic Guide11 min

Lower Wall Dampness and Peeling Paint Causes: How to Tell Plumbing Leaks from Rising Damp

Paint blisters or white salt crystals 15 to 60 cm above the skirting boards are never just a cosmetic issue to repaint. They show active moisture movement that must be traced to its source.

Read Engineering Guide & Comparison
Bathroom Ceiling Leak Diagnostic Guide11 min

Water Leaking from the Bathroom Ceiling: How to Find the Exact Source Upstairs Without Random Demolition

Yellow stains or active drops may appear on your bathroom ceiling or gypsum soffit. The source is in the wet area directly above. But is it a pressurized supply pipe, a drainage elbow, worn tile grout or a breached slab membrane?

Read Engineering Guide & Comparison
CallWhatsApp